Skip To Main Content

June 9th Referendum Information

June 9th Referendum Information

The second project on the June 9th ballot: a kitchen remodel at the elementary school.

Our elementary kitchen serves students every single day — but the space and equipment haven't kept pace with what's needed to do that well. The School Facilities Improvement Committee identified this as a priority because it directly affects the health, safety, and experience of our youngest students.

A modernized kitchen means:

→ Better food safety and compliance with current standards

→ More efficient meal preparation for staff

→ An improved daily experience for all students and staff

Together with the high school HVAC replacement, this remodel brings the total referendum cost to $6.3 million

— the number the community itself pointed to as a comfortable investment level.

This is a focused, practical plan. Two projects. Real impact. Full details: https://www.designwithicon.com/oakes


 
Read More about June 9th Referendum Information